1 min read

Hospitality at Full Power

Hospitality at Full Power
Embion EMS at Wollenbrand Lakehouse

At the charming Wollenbrand Lakehouse restaurant, the team wanted to provide guests with the best possible service. One of their wishes was to allow visitors to charge their electric cars during lunch or dinner. However, the restaurant soon ran into limitations. The contracted power capacity wasn’t always sufficient to meet the demand.

 
Limited power, smart ambition

The first thought was often: “Let’s just install solar panels.” But when the restaurant was closed, the panels still generated energy, and feeding it back into the public grid wasn’t allowed. This made it challenging to provide enough charging capacity without overloading the grid.

 
A smart solution

Together with Xandrion and Rexel Netherlands, Dion Bruinen’s team installed a complete system: the Embion EMS closely monitors the power consumption and distribution across the main and sub-distribution boards, the two Alfen charging stations, and the 17 kW PV installation. This way, the EMS ensures that the available power is distributed efficiently, allowing cars to charge without overloading the grid or incurring additional costs.

 
Technology working together

This project demonstrates what’s possible when intelligent energy management solutions and reliable hardware come together. The Embion EMS intelligently controls the system, while Xandrion and Dion Bruinen ensure expert installation. As a result, Wollenbrand Lakehouse now enjoys a future-proof charging and energy management setup, allowing guests to relax and enjoy their meal while their electric cars charge worry-free.

 
 

Read more:

Smart power without grid reinforcement

Smart power without grid reinforcement

AccuPower installs Embion EMS at Grytte Bloemenheuvel At Grytte Bloemenheuvel in Driebergen, an inspiring coworking space located in the former...

Read more
Calf farm reduces energy costs with Embion EMS

Calf farm reduces energy costs with Embion EMS

The challenge On a calf farm, everything revolves around continuity: heat to prepare milk, ventilation, lighting and various installations that...

Read more
Future-proof cooling system thanks to a smart battery project with EMS

Future-proof cooling system thanks to a smart battery project with EMS

At Fresh2You in Heerle, a new cold storage unit was recently installed, significantly impacting the site’s energy consumption. To absorb peak loads...

Read more
Smart Energy Solution for Restaurants with Limited Grid Capacity

Smart Energy Solution for Restaurants with Limited Grid Capacity

A new downtown restaurant had insufficient power to handle spikes in energy consumption. There was no room for an outdoor battery, and fire safety...

Read more
Feed in only when there is enough space on the grid

Feed in only when there is enough space on the grid

Claassen Logistics in Tilburg, in cooperation with Enexis and DSG, has started an innovative project that enables feed-in to the grid even with...

Read more
One solution for different brands of inverters: The Embion EMS

One solution for different brands of inverters: The Embion EMS

One unique challenge Two different brands of inverters: an older SolarEdge system and a new Huawei system. These different brands could not...

Read more